MUKHANG magtatagal pa ng ilang buwan ang nararanasang kawalan ng tubig sa ilang lugar.
Inanunsyo kasi ng Maynilad Water Services na magpapatuloy ang daily water service interruptions sa ilang bahagi ng Las Piñas City, Bacoor, at Imus hanggang sa Nobyembre.
Hindi na ito bago sa mga nabanggit na lugar dahil kung maaalala ay noong June 28 pa sila nawawalan ng tubig dahil sa ginagawang maintenance ng Maynilad.
Ayon sa latest advisory ng water concessionaire, sa August 8 sana matatapos ang ginagawang pag-aayos sa Putatan Water Treatment Plant 2, pero kinailangan nila itong i-extended ng hanggang November 2 para na rin sa paghahanda sa Amihan Season.
“[This is] in preparation for the Amihan Season when increases in the turbidity level of the raw water of Laguna Lake typically occur. The membranes are being replaced in batches to minimize the impact on customers of the resulting lower water production,” paliwanag ng Maynilad.
Baka Bet Mo: Pamilya ni Mahal bumuwelta sa paratang na ‘mukhang pera’, kapatid na pulis may inamin
Dagdag pa, “We have already completed the replacement of the initial batch of three UF membranes, so we will now proceed with the replacement of the remaining 11 units.”
Muli nilang pinayuhan ang apektadong mga residente na mag-imbak ng sapat na tubig bilang paghahanda sa patuloy na daily water service interruptions.
Narito ang kumpletong listahan ng mga lugar, petsa at oras na mawawalan ng tubig:
Las Piñas City
5 p.m. to 6 p.m. daily from August 8 to November 2, 2023
-
Almanza Uno (Doña Josefa Village, Great Plains, and Lower Laong)
-
Pilar (Camella Homes Pilar, Gloria Compound, Pag-asa Compound, Maligaya Compound, and Pilar Village)
-
Talon Dos (BF Resort, Castilian Classics, Fronterra, Veraville Villa Grande Abel Nose, and Veraville Villa Grande Royale)
-
Talon Singko (Agro Homes 1 & 2, Christian Ville, Delnor Subdivision, Emaus, Doña Leoncia Homes, Golden Acres, Hamilton Heights, along Marcos Alvarez, Manuela Homes, Pamplona Metrocor, Pamplona Metrocor 1, Mike Sell, Moonwalk Village, Prutas Neighborhood, Rainbow Village, Royal South, Saint Scholastica, Samata Savior Ville, Soldier Hills 2, Teresa Park, Villa Pangarap, Veraville 3, Veraville Homes 3A, Veraville Fremont, Veraville Townhomes Classic, Veraville Townhomes 1, Villa Luningning, and WonderLand)
Bacoor City
5 p.m. to 6 p.m. daily from August 8 to November 2, 2023
-
Molino I (Marcos Alvarez Extension from Evergreen to St. Joseph Homes)
-
Molino Ill (Bagong Silang Blk 2, Bagong Silang P3, Bagong Silang Blk 3-2, Bagong Samahan ng Magkakapitbahay, Katherine Townhomes, Lynville-Annville Subdivision, Green Valley Subdivision, Magdiwang Subdivision, Melrose Park, Molino Park Homes, Molino Road Westside, Molino Heights Subdivision, Molino Road Westside (Avenida Rizal to Daanghari; Kanluran 2 Village), Progressive Village 12, 14 & 16, Queensrow (Bagong Silang Phase 1 & 2, Strikeville I, Town & Country Homes, Villa Cristorey Vizcarra Compound and Villa Maria)
-
Molino IV (Along Molino Road Westside (Phoenix to Paradiso)), Along Molino Road Eastside (from Daanghari to Dasmariñas Boundary, Duplex Subdivision, Elisa Homes Phase 2A, Georgetown Heights Phase 1 &2, Likha Village, Mary Homes, and Max Village)
-
Molino VI (BF Topman 2 and Soldier Hills Phase 1 to 4)
-
Molino VIl (Bagong Silang Interior, San Lorenzo Ruiz Subdivision,and St. Joseph Homes)
-
Queens Row Central
-
Queens Row East
-
Queens Row West (Sunvar Subdivision (Garden City II))
-
San Nicolas Ill (Bagong Kampi, Evergreen Street, Greenvalley Subdivision, Molino I (from Soldiers Hills Phase 1 Gate exiting Marcos Alvarez), NSGB, Poor’s Park, River Side, Samahang Magkakapit-bisig and Villa Mateo Subdivision)
Imus City
5 p.m. to 6 p.m. daily from August 8 to November 2, 2023
-
Pasong Buaya I (Vermosa Estates)
-
Pasong Buaya Il (Pasong Buaya Il Road and Vermosa Estates)